Video Testimonials

Lisnagelvin Primary School

Hear a recent testimonial from Colm Torrens, principal of Lisnagelvin Primary School.

Since 2012 Beaver Log Cabins supply and install a range of different cabins to suit the needs of the school.

These include a ‘Music room’, ‘Nurture Classrooms’, ‘Special Needs and Sensory Class Room’

The concrete foundation base was prepared and laid by Beaver Log Cabins Ground crew. The cabin was assembled on-site by our highly skilled carpenters and our painting crew left a top-quality paint finish inside and outside using their unique 5 stage painted method.

Cabin With Fitted Bar

The cabin was supplied and installed by Beaver Log Cabins in the Waterside area of Derry and fitted with a working bar with seating outside.

The concrete foundation base was prepared and laid by Beaver Log Cabins Ground crew.

The cabin was assembled on-site by our highly skilled carpenters who also supplied the bespoke 2 piece handmade 70mm Log bar complete with an engraved mirror.

The Beaver Log cabins painting crew left a top-quality paint finish inside and outside using their unique 5 stage painted method.

All the Electrical work including Eco friendly heaters inside, Patio heaters outside, internal and external modern LED lighting.

Log Bar in Derry

Hear a recent testimonial from Pam Wilson, a customer who purchased a Jukta 45mm supplied flatpack only for a self build the full kit was supplied with all components to carry out the cabin build which included insulation, Epdm roofing, guttering, laminate flooring, heaters, and a paint package.

A contemporary flat roof model in 45mm logs. The Jutka is a stunning addition to a corner location. Centrally there is the enclosed log cabin measuring 3.68m x 3.68m and flanked either side are two gazebo areas. Great for bbq’s and outdoor lounging, relaxing and dining. Being made of 45mm logs with double glazing this could also become your outdoor office. Overall the cabin is 6.78 x 6.78m.

Happy Customers

Shopping Cart
Scroll to Top